Product Detail :
|
Resetting work of Pontoon Bridge after repair and supplying of necessary Iron Material and Maintainance of Pontoon Bridge for five consecutive years i.e 2023-24, 2024-25, 2025-26 , 2026-27 & 2027-28 Dismentling of Pontoon Bridge for the alignment and storing the Pontoon sets at Safe Place on the sie of River embankment at Mahuli Ghat to Sitab Diara, District side for during rainy season and watching the Pontoon sets safely anchored along the river embankment during rainy season for six month as well as re-arranging the Pontoon sets when ever required due to increasing and decreasing of water level.
|